Today we presented the Full-Scale Track presentation.



Some suggestions made by Ron Swenson for our track structure was to integrate infrastructure such as water pipes, power cables, and other cables alongside the vertical supports of the track. We will also need to add trussing or diagonal bracing along these vertical supports to provide more strength and rigidity to the system. The final thing discussed dealt with plasma cutting our materials in order to prevent compromising the material properties and structural integrity of our materials, which can occur during welding and heating. With all these tasks on hand, the simpler solution is also the better solution. All these problems will need to be addressed, but we will also need to take into account of making this system easy to assemble, disassemble, and maintain.

Comments

Popular posts from this blog

Spring 2018 - Week 4

Spring 2018 - Week 3